Indonesian Dragon revealed their project about their power plants and ferronickel production

  • Monday, October 29, 2018
  • Source:ferro-alloys.com

  • Keywords:Indonesian Dragon, power plant, ferronickel production
[Fellow]Indonesian Dragon revealed their project about their power plants and ferronickel production

[ferro-alloys.com]It is said that Indonesian Dragon power plant is being constructed. The part 4 of 1st period plan contains two 125MW units. After the work of part 4 is finished, it will release the pressure of power shortage. The Dragon has finished three parts’ works. The first part contains two 30MW units, the second part contains two 50MW, and the third part contains 60MW. They all have been put into production.

According to the schedule of Dragon, there will be 15 ferronickel alloys production lines in the first period. In the second period, the number of production lines will be 35. A senior manager of Dragon said that the task of 2018 is to ensure that 12 production lines will be constructed and put into production by the end of 2018.

  • [Editor:王可]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!