Through the newly built transmission line, power will be sent to a local 550,000-ton electrolytic aluminum program, which will generate an annual power consumption of around 7.5 billion kilowatt-hours.
Brazilian miner Vale reported on Tuesday a 5.5% increase in its third-quarter iron-ore production compared to a year earlier, reaching the highest level in almost six years.