VetroSGC2 Gets Permit for Berestovskaya Wind Farm in Stavropol

  • Tuesday, June 22, 2021
  • Source:ferro-alloys.com

  • Keywords:wind,power,Stavropol
[Fellow]VetroSGC2 Gets Permit for Berestovskaya Wind Farm in Stavropol

[Ferro-Alloys.com]ROSATOM’s wind energy division NovaWind JSC’s VetroSGC-2 JSC has obtained the permit for the construction of the Berestovskaya wind farm with a total capacity of 60 MW in the territory of Petrovskiy urban district in Stavropol Krai. The permit was preceded by a positive expert examination of design documents issued by State Expertise in Construction, the Stavropol Krai Autonomous Institution, for the construction of a wind farm that includes 24 wind turbines with a capacity of 2.5 MW each.

Successful expert examination confirms that the design documents for construction facilities comply with the site investigation results and the requirements specified in all technical regulations, in particular environmental, sanitary, epidemiological, fire safety requirements, regulatory and technical documentation and the Urban Development Code of the Russian Federation.
 
The Stavropol Krai is a key region for the projects implemented by NovaWind JSC. At present, two large wind farms – Kochubeyevskaya wind farm (210 MW) and Karmalinovskaya wind farm (60 MW) – have been commissioned in this region. In addition, wind farms construction for a total capacity of about 180 MW is under way in the region.
 
source:SteelGuru Business News
  • [Editor:李慧]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!