NDRC: organize coal production according to the maximum capacity

  • Monday, January 18, 2021
  • Source:ferro-alloys.com

  • Keywords:NDRC, coal production, maximum capacity
[Fellow]Under the premise of ensuring safety, the coal production should be organized according to the maximum capacity.

[Ferro-Alloys.com

On January 13, National Development and Reform Commission held a video conference, which stressed that under the premise of ensuring safety, the coal production should be organized according to the maximum capacity, the transportation capacity of power plants with low coal storage should be strengthened, and the surplus and shortage of electricity should be well balanced. It is necessary to do a good job in epidemic prevention and control, and ensure that the coal transportation and LNG transportation vehicles in the epidemic area will not be affected. In particular, it is necessary to ensure the normal operation of power supply, gas supply and heating facilities. 
 
Source: translated from ocoal.com
 
  • [Editor:kangmingfei]

Tell Us What You Think

please login!   login   register
Please be logged in to comment!